Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | BULD - Electrical Clearance | Re-inspection required | 07 FEB 25 Not ready. No response from Contractors. Voicemail was left. |
|
| 04/04/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending solar |
|
| 04/18/2025 | BULD - Electrical Clearance | Passed | approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |