Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | BULD - Electrical Clearance | Not Ready | 01/27/2026 Not ready. Contractor requested in field inspection but inspector is not available for site visits with current workload. Please have technician available for remote video inspection on site. Or upload detailed photos to the TDC online portal to verify SolarApp checklist and 3-line diagram in plans to include wires sizes/equipment and include images of the panel layout on roof with setbacks and bonding. |
|
| 01/30/2026 | BULD - Electrical Clearance | Passed | 01/30/2026 Clearance TEP DGC. Verified uploaded install photos to TDC portal and SolarApp checklist for code compliance. |