Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | BULD - Electrical Clearance | Canceled | ||
| 10/16/2025 | BULD - Electrical Clearance | Passed | 10.16.2025 Clearance to TEP DGC. |
|
| 11/10/2025 | BULD - Electrical Clearance | Passed | 11.10.2025 Passed on 10.16.2025 and TEP said waiting on documents from Renewables Department. |
|
| 12/08/2025 | BULD - Electrical Clearance | Re-inspection required | 12/09/2025 Please upload revised SolarApp checklist to reflect change from piercing connector for line side tap to junction box with 1/0 AWG per latest plans. |
|
| 12/08/2025 | BULD - Electrical Clearance | Partial Pass | 12/08/2025 TEP needs to verify meter socket adapter or line side tap was performed per TEP technician notes. Assigned inspection for tomorrow. |
|
| 12/09/2025 | BULD - Electrical Clearance | Passed | 12/09/2025 Approved: Clearance to TEP DGC/DGL. Yesterday had powerkill for DGL line side tap and verified in SolarApp checklist the Polaris connectors in junction box. I field-verified that there was a line-side tap on site and not a meter socket adapter - approved per plan. |