Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending revised solar design for final |
|
| 05/01/2025 | BULD - Electrical Clearance | Passed | 05/01/25 TEP CLEARANCE: DGC/BAT |