Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP at 10:15am Pending solar |
|
| 12/12/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |