Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap in meter can - DGL Clearance was called into TEP Pending Solar |
|
| 02/04/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |