Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade and Tesla meter adapter - INCR Clearance was called into TEP at 11:25 Pending solar |
|
| 06/11/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required |