Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2026 | BULD - Electrical Clearance | Canceled | ||
| 04/07/2026 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP DGL. (Line side tap with Polaris plugs) 4/7/2026 | |
| 04/20/2026 | BULD - Electrical Clearance | Not Ready | did not reach back out by 230pm | |
| 04/28/2026 | BULD - Electrical Clearance | Passed | 4.28.26 Approved |
|
| 06/03/2026 | BULD - Electrical Clearance | Canceled | 06/03/2026 Canceled at contractor request. |
|
| 06/10/2026 | BULD - Electrical Clearance | Passed | 06/10/2026 Clearance TEP DGC. Powerkill RECN same day due to change of solar SE10000 inverter. Verified revised plans and SolarApp checklist, RMC conduit added. |