Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | BULD - Electrical Clearance | Canceled | Canceled per contractor. 2/17/2026 | |
| 03/05/2026 | BULD - Electrical Clearance | Passed | 3.5.26 Approved for incr Gas/water bond verified Rods verified |
|
| 04/09/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 4/9/2026 | |
| 04/09/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 4/9/2026 |