Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Permit Number - TC-SOL-0924-00588

Inspection Description - BULD - Electrical Clearance

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/03/2024 BULD - Electrical Clearance Partial Pass Partial for the 80A meter adapter - DGL Clearance was called into TEP at 10:20am
Pending solar
10/07/2024 BULD - Electrical Clearance Not Ready
10/08/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter