Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | BULD - Electrical Clearance | Passed | Installed per plans, grounding and labels per code, CLEARANCE DGC | |
| 12/10/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 80A meter adapter - DGL Clearance was called into TEP Pending solar |