Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2025 | BULD - Electrical Clearance | Passed | . 11/20/24 - Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar 1/3/25 solar DGC clearance approved. |
|
| 02/28/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 11/20/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |