Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade- INCR Clearance to TEP was called into TEP at 2:35 Pending solar |
|
| 11/27/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |