Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 80A meter adapter - DGL Clearance was called into TEP at 9:10am Pending solar |
|
| 10/10/2024 | BULD - Electrical Clearance | Not Ready | ||
| 10/17/2024 | BULD - Electrical Clearance | Not Ready | No change, unable to verify wire sizes | |
| 11/04/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |