Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | BULD - Electrical Clearance | Passed | 6.24.25 CLEARANCE CODE TO TEP. Bonding/grounding verified. Proper breakers, labels and listings verified. 2 straps securing riser. Mast under 3ft no brace kit required. |
|
| 08/06/2025 | BULD - Electrical Clearance | Partial Pass | 8/6/25 INCR was passed by A.C. On 6/24/25. Still pending solar. |
|
| 08/22/2025 | BULD - Electrical Clearance | Partial Pass | 8/22/25 TEP CLEARANCE: INCR, partial pass pending solar. |
|
| 10/03/2025 | BULD - Electrical Clearance | Canceled | 10.3.2025 Canceled by contractor. Waiting revision to SolarApp for 200A MPU. |
|
| 10/03/2025 | BULD - Electrical Clearance | Canceled | 10.3.2025 Canceled by contractor. Waiting revision to SolarApp for 200A MPU. DUPLICATE. |
|
| 10/13/2025 | BULD - Electrical Clearance | Canceled | ||
| 10/13/2025 | BULD - Electrical Clearance | Canceled | ||
| 10/13/2025 | BULD - Electrical Clearance | Canceled | ||
| 10/16/2025 | BULD - Electrical Clearance | Passed | 10.16.2025 Approved, revised plans match onsite. |
|
| 10/16/2025 | BULD - Electrical Clearance | Passed | 10.16.2025 Clearance to TEP DGC. |