Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-SOL-0924-00507

Parcel: 140170390


Addresses:

4902 S HIGHLAND DR

Inspection Status: Passed

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/24/2025 BULD - Electrical Clearance Passed 6.24.25
CLEARANCE CODE TO TEP. Bonding/grounding verified. Proper breakers, labels and listings verified. 2 straps securing riser. Mast under 3ft no brace kit required.
08/06/2025 BULD - Electrical Clearance Partial Pass 8/6/25
INCR was passed by A.C. On 6/24/25. Still pending solar.
08/22/2025 BULD - Electrical Clearance Partial Pass 8/22/25
TEP CLEARANCE: INCR, partial pass pending solar.
10/03/2025 BULD - Electrical Clearance Canceled 10.3.2025
Canceled by contractor. Waiting revision to SolarApp for 200A MPU.
10/03/2025 BULD - Electrical Clearance Canceled 10.3.2025
Canceled by contractor. Waiting revision to SolarApp for 200A MPU. DUPLICATE.
10/13/2025 BULD - Electrical Clearance Canceled
10/13/2025 BULD - Electrical Clearance Canceled
10/13/2025 BULD - Electrical Clearance Canceled
10/16/2025 BULD - Electrical Clearance Passed 10.16.2025
Approved, revised plans match onsite.
10/16/2025 BULD - Electrical Clearance Passed 10.16.2025
Clearance to TEP DGC.