Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP was called at Pending solar |
|
| 02/24/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |