Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
10/15/2025 BULD - Electrical Clearance Partial Pass 10.15.2025
Verbal clearance for TEP INCR at 12pm for 200A MPU. Partial pending solar final.
11/03/2025 BULD - Electrical Clearance Canceled 11.3.25
CANCELED PER CONTRACTOR. CONTRACTOR DOES NOT HAVE ACCESS TO EQUIPMENT ON SITE.
11/03/2025 BULD - Electrical Clearance Canceled 11.3.25
CANCELED PER CONTRACTOR. CONTRACTOR DOES NOT HAVE ACCESS TO EQUIPMENT ON SITE.
11/12/2025 BULD - Electrical Clearance Canceled
11/12/2025 BULD - Electrical Clearance Canceled
11/26/2025 BULD - Electrical Clearance Passed Passed 11/26/26 CLEARANCE DGC
11/26/2025 BULD - Electrical Clearance Passed Passed 11/26/26 CLEARANCE DGC