Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2025 | BULD - Electrical Clearance | Canceled | 10.3.2025 Canceled by contractor. |
|
| 10/20/2025 | BULD - Electrical Clearance | Passed | 10/20/2025 verbal clearance for TEP INCR/DGC. | |
| 10/20/2025 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP DGL/DGC. 10/20/2025 (This is the actual clearance code I sent in to TEP. Disregard first code.) |