Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10:20am Pending solar final |
|
| 09/22/2025 | BULD - Electrical Clearance | Passed | 9.22.2025 Clearance for TEP DGC/BAT. |