Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2026 | BULD - Electrical Clearance | Canceled | ||
| 01/07/2026 | BULD - Electrical Clearance | Canceled | ||
| 01/13/2026 | BULD - Electrical Clearance | Re-inspection required | 01/13/2026 Upload to TDC online portal the updated SolarApp checklist reflecting 200A MPU as it shows in plans. |
|
| 01/13/2026 | BULD - Electrical Clearance | Re-inspection required | 01/13/2026 Upload to TDC online portal the updated SolarApp checklist reflecting 200A MPU as it shows in plans. |
|
| 01/20/2026 | BULD - Electrical Clearance | Passed | Passed final 1/20/26 - Verified with Inspector that battery was included (01/21/26)JConrad | |
| 01/20/2026 | BULD - Electrical Clearance | Passed | Passed final 1/20/26 - Verified with Inspector that battery was included (01/21/26)JConrad | |
| 12/29/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP INCR. 12/29/2025 |