Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2025 | BULD - Electrical Clearance | Partial Pass | 8/20/25 TEP CLEARANCE: INCR, partial pass pending solar. |
|
| 09/04/2025 | BULD - Electrical Clearance | Passed | Approved solar with 175A derate - DGC Clearance to TEP is required for the solar meter |