Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | BULD - Electrical Clearance | Not Ready | Field installation does not match the approved set of drawings. Revision is required to the installation of equipment. 2/9/2026 |