Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL Clearance was called into TEP a Pending solar |
|
| 11/14/2024 | BULD - Electrical Clearance | Passed | Installed per plans, bonding and labels per code, CLEARANCE DGC 11/14/24 |