Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |
|
| 10/17/2024 | BULD - Electrical Clearance | Not Ready | ||
| 10/25/2024 | BULD - Electrical Clearance | Not Ready | Still unable to verify wire sizes | |
| 11/14/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |