Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2024 | BULD - Electrical Clearance | Not Ready | NR, canceled by contractor | |
| 09/18/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP at 10:10am Pending solar |
|
| 11/14/2024 | BULD - Electrical Clearance | Passed | Installed per plans, bonding and labels per code, CLEARANCE DGC 11/14/24 |