Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch- DGL Clearance was called into TEP at 11:00 am Pending solar final |
|
| 11/17/2025 | BULD - Electrical Clearance | Passed | 11/17/25 partial pass for solar backup switch, CALLED TEP 11:17 CLEARANCE DGL | |
| 12/02/2025 | BULD - Electrical Clearance | Passed | 12.02.2025 Clearance to TEP DGC/BAT. |