Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP at 11:45am Pending solar |
|
| 09/27/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |