Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 09/17/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the meter adapter - DGL Clearance was called into TEP at 10:25 am Pending solar |
|
| 12/18/2024 | BULD - Electrical Clearance | Canceled |