Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | BULD - Electrical Clearance | Passed | 1.5.26 Approved for DGC clearance to TEP |
|
| 12/03/2025 | BULD - Electrical Clearance | Re-inspection required | 12.03.2025 Upload approved plans into TDC online portal, currently the file status is showing Required For Resubmittal. Move 100A main breaker away from 20A backfeed breaker on opposite side of panel. |
|
| 12/19/2025 | BULD - Electrical Clearance | Not Ready | 12/19/2025 per previous notes. |