Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch - DGL Clearance was called into TEP at 10:20am Pending solar |
|
| 08/29/2025 | BULD - Electrical Clearance | Re-inspection required | Fail per pics, PW3 inverter shall be placed over a solid surface to prevent foliage growth per installation manual | |
| 09/11/2025 | BULD - Electrical Clearance | Passed | 9/11/25 TEP CLEARANCE: DGC/ BAT |