Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | BULD - Electrical Clearance | Passed | 10.22.25 DGL for MSA Partial for MSA pending solar final |
|
| 10/23/2025 | BULD - Electrical Clearance | Not Ready | Not ready. Revise set of plans to match what's installed in the field. Plans call for x2 40 amp fuses in 60 amp fuse disconnect. 10/23/2025 | |
| 11/07/2025 | BULD - Electrical Clearance | Passed | 11.07.2025 Clearance to TEP DGC. Revised plan set to reflect 40A fuses. Verified 8AWG to disconnect per SolarApp checklist. |