Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass pending solar, line side tap 1/29/25 CLEARANCE INCR Called Marcia 1:10 to restore power |
|
| 02/19/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 10/02/2024 | BULD - Electrical Clearance | Not Ready | 10/2/24 - Solar NOT READY per Jose. | |
| 10/02/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap - DGLClearance was called into TEP at 11:20am Pending solar |
|
| 11/13/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |