Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
09/10/2024 BULD - Electrical Clearance Not Ready NR, cancelled by contractor
09/26/2024 BULD - Electrical Clearance Not Ready NR, cancelled by contractor
11/13/2024 BULD - Electrical Clearance Re-inspection required Pending revised plans, current show 150, has be downsized to 125 amp main
11/19/2024 BULD - Electrical Clearance Passed Revised plans received, installed per revision, CLEARANCE DGC 11/19/24