Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 09/03/2024 | BULD - Electrical Clearance | Canceled | by contractor | |
| 10/09/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR clearance to TEP is required for the cutover Pending solar |
|
| 11/08/2024 | BULD - Electrical Clearance | Passed | Passed clearance INCR Called Roman 10:02 for cutover |