Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2024 | BULD - Electrical Clearance | Not Ready | NR, missing main conductors and bonding | |
| 09/17/2024 | BULD - Electrical Clearance | Re-inspection required | 9/17/24: failed. No acorn nuts on grounding conductor. Missing service entrance cables | |
| 09/18/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |
|
| 11/15/2024 | BULD - Electrical Clearance | Canceled | ||
| 11/26/2024 | BULD - Electrical Clearance | Canceled | ||
| 12/04/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |