Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 10/11/2024 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 12/19/2024 | BULD - Electrical Clearance | Passed | Passed. Meter socket adapter. Clearance DGL. 12/19/2024 |