Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade- INCR Clearance was called into TEP at 12:30pm Pending solar |
|
| 10/18/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, riser was extended per TEP - RECN Clearance was called into TEP at 10:30am | |
| 11/19/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the Solar meter |