Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | BULD - Electrical Clearance | Partial Pass | 8/6/25 TEP CLEARANCE: INCR, called TEP @ 11:29. Partial pass pending solar. |
|
| 08/14/2025 | BULD - Electrical Clearance | Passed | 8.14.25 PV System installed per plans Wire sizes verified Labels verified Supports verified Grounding and neutrals verified J boxes and grounding at panel arrays verified APPROVED |