Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch DGL clearance was called into TEP at 10:10 am Pending solar final |
|
| 07/24/2025 | BULD - Electrical Clearance | Re-inspection required | Add pad under Tesla battery to protect from degree and foliage, leave required.8inch clearance for ventilation between pad and bottom of battery | |
| 08/05/2025 | BULD - Electrical Clearance | Passed | 8/5/25 TEP CLEARANCE: DGC/BAT |