Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | BULD - Electrical Clearance | Partial Pass | 8/7/25 TEP CLEARANCE: INCR, called TEP @ 1:26. Pending solar. |
|
| 08/20/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW 3 - DGC/BAT Clearance to TEP is required for the solar meter |