Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2025 | BULD - Electrical Clearance | Re-inspection required | DENIED via pics - unable to identify placards and solar backfeed breaker size | |
| 08/25/2025 | BULD - Electrical Clearance | Passed | Corrections made as previous notes. DGC/incr to TEP |