Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP Pending solar |
|
| 12/03/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending solar for unit #2 |
|
| 12/06/2024 | BULD - Electrical Clearance | Passed | Installed per plans, bonding and labeling per code CLEARANCE DGC/BAT 12/06/24 |