Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2024 | BULD - Electrical Clearance | Not Ready | cancelled by contractor | |
| 08/22/2024 | BULD - Electrical Clearance | Re-inspection required | NR - missing service conductors, missing water and gas bonds to the new service panel | |
| 08/27/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade- INCR Clearance to TEP is required for the cutover | |
| 09/09/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |
|
| 11/21/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |