Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 40A meter adapter - DGL Clearance as called into TEP at 7:40am Pending solar |
|
| 09/06/2024 | BULD - Electrical Clearance | Canceled | Unable to open attached pictures, please reschedule | |
| 09/26/2024 | BULD - Electrical Clearance | Passed | Approved with pics - DGC Clearance to TEP is required for the solar meter |