Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10:15am Pending solar - CA |
|
| 09/29/2025 | BULD - Electrical Clearance | Passed | 9.29.2025 Clearance for TEP DGC/BAT. |