Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |
|
| 08/07/2025 | BULD - Electrical Clearance | Canceled | ||
| 08/07/2025 | BULD - Electrical Clearance | Canceled | 8.7.2025 Cancelled per client. |
|
| 08/13/2025 | BULD - Electrical Clearance | Passed | Approved solar -DGC Clearance to TEP is required for the solar meter | |
| 08/13/2025 | BULD - Electrical Clearance | Passed | Approved solar -DGC Clearance to TEP is required for the solar meter |