Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade and Tesla meter switch - INCR / DGL clearance was called into TEP at 11:40am Pending solar final |
|
| 07/31/2025 | BULD - Electrical Clearance | Passed | Passed solar final 7/31/25 CLEARANCE DGC/BAT |