Inspection History Details
Inspection Status: Deferred
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2025 | BULD - Electrical Clearance | Deferred | Approved solar with 60A meter adapter - DGC/DGL Clearance to TEP is required for the solar meter |