Inspection Status: Canceled

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
08/19/2025 BULD - Electrical Clearance Canceled
09/24/2025 BULD - Electrical Clearance Canceled CA, no responses
11/12/2025 BULD - Electrical Clearance Partial Pass 11.12.25
APPROVED for DGL clearance Partial pending solar
12/12/2025 BULD - Electrical Clearance Passed 12/12/2025
Clearance to TEP DGC/BAT. Approved, received revised SolarApp checklist reflecting PW3 in garage.
12/10/2025 BULD - Electrical Clearance Re-inspection required 12/10/2025
Current SolarAPP checklist has the Tesla battery location at outdoor walls - please upload revised checklist showing location in garage.