Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 80A meter adapter - DGL Clearance was called into TEP at 10:50 am Pending solar |
|
| 07/10/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |